Skip to content
Entourage
Case studyPharma

Data-Based Supply Chain Analysis with Power BI

Pharmaceutical manufacturing company with a non-transparent supply chain

Low transparency over bottlenecks in the supply chain led to inefficiencies and delays.

The challenge

The situation

The company faced considerable challenges in its supply chain: low transparency over existing bottlenecks led to inefficiencies and delays. The lack of visibility into process flows made it difficult to identify and address critical problems in a targeted way.

Our approach

What we delivered

01

Mapping of the supply-chain processes

02

Development of process KPIs

03

Monitoring of the metrics in Power BI

The outcome

Results & impact

+20% efficiency

Efficiency increase in the supply chain through transparency and KPI control.

Multi-stage project plan

Structured implementation plan for the supply-chain improvement.

In summary

The supply chain is transparent through process KPIs and Power BI monitoring; bottlenecks can be identified in a targeted way and efficiency has increased measurably.

Sources
  • Entourage project experience (anonymised)

Your project

A comparable project?

Briefly outline your situation. We'll respond with an initial assessment, usually within one business day.

Prefer direct? +39 02 8904 1000
info@theentourage.it

  • Reply usually within one working day
  • 4 offices: DE · CH · IT · US
  • 100% life sciences