How do you provide subject-matter support for an ERP implementation in life sciences, so that GMP-critical processes are mapped correctly rather than becoming a risk only at go-live?
We support ERP implementations in pharma, biotech, MedTech and IVD from the subject-matter side: from translating pharmaceutical processes into requirements, through user acceptance testing of GMP-critical workflows, to key-user training and go-live support. ERP projects rarely fail because of the software; they fail because of sequencing. If you synchronise requirements, UAT and validation under EU GMP Annex 11 only toward the end, every untested process error is pushed into the hypercare phase, when production is already running.
- Pharma
- Biotech
- MedTech
- IVD
Overview
Why do ERP implementations in life sciences fail for reasons other than the technology?
Subject-matter ERP support across all industries · EU GMP Annex 11, FDA 21 CFR Part 11, GAMP 5
Last updated: 2026-06-13
In regulated companies, an ERP system controls processes that fall under GMP: material release, batch management, status changes from quarantined to released, traceability. This makes the ERP a computerised system within the meaning of EU GMP Guide Annex 11, and it must be validated. The points where implementation projects most often get stuck lie upstream of the technology:
- Subject-matter requirements are not written in a testable way: if the user requirements describe pharmaceutical processes only in broad terms, user acceptance testing and traceability under GAMP 5 lack the reference point against which each requirement must point to a test record.
- GMP-critical workflows are under-weighted in UAT: status changes, quarantine logic and batch release as a prerequisite for QP certification under Annex 16 must be tested with realistic scenarios, not with standard paths in which everything is permitted.
- Data integrity is treated as an IT topic: audit trail, authorisation concept and electronic signatures under Annex 11 and 21 CFR Part 11 must be defined from the subject-matter side before IT configures them, otherwise a gap arises that only surfaces during an inspection.
- Training and go-live are compressed: if key-user training and hypercare support are cut to meet a deadline, untrained users and untested processes collide in live production.
Services
How we support you
Business Requirements & Process Design
Eliciting and testably documenting subject-matter requirements for pharmaceutical processes in the ERP: batch management, quality workflows, batch release and traceability. Deliverable: a User Requirement Specification with a GMP criticality assessment per requirement, ready to feed into traceability under GAMP 5.
User Acceptance Testing (UAT) for GMP processes
Planning, creating and executing UAT test plans and scenarios for GMP-critical ERP workflows, including negative tests of quarantine and release logic. Deliverable: executed UAT protocols with a defect list and a traceable release recommendation for the go-live decision.
Data Integrity & Authorisation Design
Subject-matter definition of the requirements for the audit trail, role and authorisation concept, and electronic signatures under Annex 11 and 21 CFR Part 11 as a specification for the IT configuration. Deliverable: a data-integrity requirements catalogue with segregation of duties and a traceable rationale per role.
Learn more →Key-User Training & Train-the-Trainer
Domain-specific training concepts for pharmaceutical ERP users: GMP-compliant system use, batch record creation and QA workflows, delivered to internal key users who then train the user groups. Deliverable: training materials and qualified key users with documented training records.
Go-Live & Hypercare Support
Subject-matter support during the go-live phase and immediately afterwards: rapid resolution of subject-matter questions, issue tracking and escalation support during the critical production ramp-up. Deliverable: a hypercare issue log with prioritisation and documented resolution of GMP-relevant incidents.
Interface to CSV & ERP Integration
Aligning the subject-matter requirements and UAT results with computer system validation under Annex 11 and with the technical integration, so that UAT and PQ build on one another instead of running in parallel. Deliverable: an aligned validation and UAT map with a clear delineation of responsibilities.
Learn more →How we work together
What it comes down to
An ERP implementation in life sciences follows a fixed sequence, and the bottleneck moves with you if you break it. First, the subject-matter requirements must be precise enough that every GMP-relevant function has a testable target state: status changes from quarantined to released, quarantine logic, batch release as a prerequisite for QP certification under EU GMP Annex 16. The user acceptance testing builds on this target state, and only a UAT that also tests the negative cases shows whether the configuration under EU GMP Annex 11 actually works. Only after that does the performance qualification carry weight within validation, because it builds on the scenarios already confirmed from the subject-matter side instead of repeating them. If you start any of these stages too late, you push the untested remainder into go-live.
This is precisely the sequence we focus on. Data integrity is defined from the subject-matter side before IT configures: segregation of duties, the authorisation concept and the audit trail under FDA 21 CFR Part 11 are a specification from the subject-matter side, not a matter of interpretation for the administrators. This puts the effort where corrections are cheap, in the requirements and in the UAT, and not in the hypercare phase, when production is already running and every workaround outside the validated system creates a new risk.
Our approach
Our approach
Step
Result
Process Capture & Requirements
User Requirement Specification of the GMP-relevant processes with a criticality assessment per requirement, serving as the reference point for UAT and validation.
Data Integrity & Authorisations
Defined requirements for the audit trail, role model and electronic signatures under Annex 11 and 21 CFR Part 11, handed over for IT configuration.
UAT Preparation & Execution
Executed UAT protocols with negative tests of the quarantine and release logic, a defect list and a release recommendation.
Key-User Training
Trained and demonstrably qualified key users, prepared to train the user groups.
Go-Live Support
Supported production ramp-up with an issue log, prioritised resolution and documented handling of GMP-relevant incidents.
Hypercare & Handover
Stabilised operation with a closed defect list and handover to the internal line organisation.
Common pitfalls
Where projects commonly fail
The user requirements remain too general.
If a GMP process such as batch release is captured only as a heading, the UAT lacks the testable target state, and testing degenerates into a clicking exercise instead of evidence that the quarantine logic under Annex 11 actually works.
Only standard paths are tested in UAT.
The team verifies that release works when all conditions are met, but not that the system reliably blocks a quarantined batch. It is precisely this negative test that determines whether the configuration is GMP-compliant.
Data integrity is left to IT.
The authorisation concept, segregation of duties and audit trail under Annex 11 and 21 CFR Part 11 are configured without subject-matter specifications, so the same person can both book and release a batch, which surfaces as a data-integrity risk in the event of an inspection.
UAT and validation run in parallel without coordination.
The subject-matter UAT and the performance qualification under GAMP 5 partly duplicate the same tests while leaving GMP-critical scenarios in between untested, because no one has defined the delineation of test responsibility.
Hypercare is ended too early.
If subject-matter support is withdrawn at go-live, open defects remain unresolved in live production, and users circumvent unresolved steps with workarounds outside the validated system.
FAQ
Frequently asked questions
Sources
- EU GMP Guide Annex 11 (Computerised Systems) - primary text
- FDA 21 CFR Part 11 (Electronic Records; Electronic Signatures) - primary text
- ISPE GAMP 5: A Risk-Based Approach to Compliant GxP Computerized Systems
- EU GMP Guide Annex 16 (Certification by a Qualified Person and Batch Release)
- PIC/S PI 041 - Good Practices for Data Management and Integrity in Regulated GMP/GDP Environments
- https://theentourage.de/expertise/erp-software-implementation-support/ (existing page content, revised)
Life Science Journal
Regulatory updates, straight to your inbox.
New requirements, authority decisions and practice notes. Once a month, unsubscribe any time.
Case Studies
What this looks like in practice
Related insights
All insights →Regulations & standards considered
- EU GMP Guide Annex 11 (Computerised Systems)
- FDA 21 CFR Part 11 (Electronic Records; Electronic Signatures)
- GAMP 5 (ISPE Good Automated Manufacturing Practice, A Risk-Based Approach to Compliant GxP Computerized Systems)
- EU GMP Guide Annex 16 (Certification by a Qualified Person and Batch Release)
- ICH Q9 (Quality Risk Management)
- PIC/S PI 041 (Good Practices for Data Management and Integrity in Regulated GMP/GDP Environments)
Related topics
ERP Integration →
The technical system integration and connection, distinct from the subject-matter support
Computer System Validation →
Formal validation evidence under EU GMP Annex 11 from URS to PQ
21 CFR Part 11 & Data Integrity →
Audit trail, authorisations and electronic signatures in detail
Digitalisation →
ERP as a building block of the digital process landscape
Have a concrete project?
Briefly outline your situation. We'll respond with an initial assessment, usually within one business day.
Prefer direct? +49 89 4161170-0
info@theentourage.de
- Reply usually within one working day
- 4 offices: DE · CH · IT · US
- 100% life sciences